Quantcast
Channel: Croydon Advertiser Latest Stories Feed
Viewing all articles
Browse latest Browse all 5354

Croydon travel update 19/4/2013 - headache for marathon runners

$
0
0
TRAFFIC is building on the roads and a car striking a bridge is causing delays on the London Bridge Line.
There are currently delays of up to 30 minutes between Uckfield and Oxted - on the London Bridge Line - due to a car striking a bridge at Buxted this morning.
The delays are affecting the whole line through East Croydon into the capital. 
Southern Rail is reporting no problems on its lines in the Croydon area and most other services are showing no disruption.
There are delays of around 10-15 on the A236 heading towards Mitcham from Purley Way.
Runners in Sunday's London Marathon face a travel headache getting into the capital due to emergency engineering work.
Work will be carried out on a recently discovered rail defect between London Waterloo and Vauxhall which will close platforms 1-10 of London Waterloo until 4pm on Sunday (April 21).
The delays will mean there is no service or limite service south of Wimbledon to and from Dorking Guildford, Chessington South, Windsor and Eton Riverside and Shepperton.
Visit  www.nationalrail.co.uk for information.

Croydon travel update 19/4/2013 - headache for marathon runners


Viewing all articles
Browse latest Browse all 5354

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>